Cleaning after finishing
Cleaning after finishing
A team consisting of 3 or 4 workers + the supervisor was present.
•They will have a car equipped with all the tools, equipment and places they will need for cleaning.
•The operations manager himself comes down at the end of the day to follow up and ensure the quality of cleaning.
•All remaining paint was removed from the floors, doors and windows using materials appropriate for each type.
•All stickers were removed from the aluminum metal and devices and all traces of them were removed.
•Removing paint and cement from the terrace and crystal iron using appropriate materials.
•All remaining paint was removed from the bathrooms and kitchens.
•All the tiles in the handrail, the terrace, the shower cabin, the dressing room, and the mirrors were cleaned and polished.
• All floors were cleaned and polished with the appropriate machines and equipment for each floor.
•Any traces or fingerprints on the walls and cabinets were cleaned