team consisting of 3 or 4 workers + a supervisor was present. •They will have a car with them, with all the tools and places they will need for cleaning. •The operations manager himself visits every end of the day to follow up and ensure the quality of cleaning. •All remaining grease was removed from the floors and doors and thickened with the correct materials for each type. •All stickers were removed from the aluminum metal and devices and their effectiveness was removed. •Removing paint and cement from the terrace and crystal iron using appropriate materials. •All remaining paint was removed from the bathrooms and kitchens.
military vehicle arrived with all the equipment and assemblies, with a team consisting of 4 workers + a supervisor. - The paint was removed and the furniture below and below was wiped down. - The old cabinets were cleaned of excess paint. - The carpets were vacuumed and dusted and the bottom was mopped. - All walls were deeply cleaned and fingerprints removed from them. - The ceilings were polished, spider traces and soil were removed, and fingerprints and lighting units were removed. - Chandeliers of all sizes were cleaned and polished
The reception and living rooms were cleaned Floors were swept and mopped and carpets were vacuumed The walls and ceiling were damaged The furniture was polished All tables and surfaces have been polished The windows and glass were cleaned of dust, inside and out The furniture was swept and cleaned without moving it
A team consisting of 3 or 4 workers + the supervisor was present. •They will have a car equipped with all the tools, equipment and places they will need for cleaning. •The operations manager himself comes down at the end of the day to follow up and ensure the quality of cleaning. •All remaining paint was removed from the floors, doors and windows using materials appropriate for each type. •All stickers were removed from the aluminum metal and devices and all traces of them were removed. •Removing paint and cement from the terrace and crystal iron using appropriate materials. •All remaining paint was removed from the bathrooms and kitchens. •All the tiles in the handrail, the terrace, the shower cabin, the dressing room, and the mirrors were cleaned and polished. • All floors were cleaned and polished with the appropriate machines and equipment for each floor. •Any traces or fingerprints on the walls and cabinets were cleaned
The integrated pest control program applied at the Baron Resort Hotel The Integrated Pest Control Program (IPM) is applied, which is divided into 1- Crawling insects (ants - insects - cockroaches - termites - beetles) 2- Flying insects (flies - mosquitoes - midges - winged ants) 3- Rodents (rats - weasels) 4- Poisonous pests (albers - lizards - scorpions - snakes)
A good inspection was done. If the infested house or place is properly inspected, the problem will be treated and bed bugs will be combated more effectively -All clothes were well researched - The cupboards were checked and emptied - Cartons and paper or wooden boxes were disposed of - The beds and sofas inside the house were examined - The bed's anchor or the arms holding the mattresses were examined, as well as the corners of the bed and the exit and entry points of the screws and their openings. - The window trims and room doors were inspected from the inside - Move any wall images - Checking the gypsum board if there are any gypsum board works
The old trees in the garden were cut and trimmed The garden is leftover from pruning and cutting Spraying a chemical (disinfectants in pruning areas to protect trees from fungal diseases) Tree trunks were painted (Bordeaux paste made to protect against fungal and insect diseases)